Tender For 1 inch installation tool of lock bolting machine 1) supply and fitment of the item anvil 2) nose assembly bore damage, zero pulling and pushing load -release and hold ejector material filling, grinding, jig boring, hardening, machining work 3)cylinder boar damage - material filling, jig boring 4) lock cylinder bush damage - machining, thread taping, milling 5) advance and return lone connector line leakage - cleaning and machining, seal kit replacements 6) complete seal kit replacement 7) hose replacements with qrc with high pressure fittings load test @ maximum pull push load with 700 bar pressure.